Home › Gas Generator Sets › AP-700NG — 700 kW

700 kW Associated Gas Generator Set — AP-700NG

Built for the hardest gas duties in the range: a 700 kW containerized genset for oilfield associated gas, coal mine gas and wellhead gas sites that run for very high hours per year and where the alternative is flaring or running a diesel genset.

AP-700NG 700 kW containerized gas generator set, exterior view

Overview

The AP-700NG targets sites where the gas is a by-product rather than a designed fuel stream. Associated petroleum gas from production, coal mine gas from ventilation shafts and wellhead gas all have properties that differ from pipeline natural gas: fluctuating pressure, variable methane content, hydrogen sulphide and condensible hydrocarbons. A genset that runs cleanly on pipeline gas can fail on these fuels, so the gas train and the engine match are decided by your analysis, not by the model number.

Output is available from 400 V up to 10.5 kV, which lets the unit sit either behind an existing low-voltage distribution board or feed directly into a site substation. The containerized build is intended for outdoor installation on a prepared base, with the fuel, ventilation and control systems integrated inside the enclosure.

Technical Data

Rated power (prime)700 kW / 875 kVA
Standby overload770 kW (10%, 1 h in 12 h)
Electrical efficiency38–41% (stated per project with guarantee value)
Frequency50 Hz or 60 Hz
Output voltage400 V / 6.3 kV / 10.5 kV
Rated speedTo be confirmed per engine selection
GovernorElectronic, isochronous load sharing option
Starting24 V DC electric
Overhaul interval60,000 h
Fuel gas pressureTo be confirmed per gas train
CoolingRadiator / remote radiator / heat recovery option
ParallelingUp to 32 units

Configurations

20 ft / 40 ft container Open skid High voltage 6.3 / 10.5 kV Gas treatment skid Remote radiator Paralleling plant

FAQ

Can the AP-700NG run on coal mine gas?

Yes, with the right treatment. Coal mine gas is low in methane and can contain significant H₂S, so output has to be derated from the nameplate and the desulfurization package sized accordingly. This is a common application in Chinese coal mining regions and we will state the guaranteed rating on your specific gas analysis rather than on pipeline assumptions.

What does 10.5 kV output change?

It lets the unit connect at a higher voltage level, which reduces current and therefore cable losses over long distances — relevant for open-pit mines and oilfields where the genset sits far from the load centre. At 400 V the same power would require much heavier cabling. We confirm the connection voltage against your existing switchgear.

How does high-hours operation affect maintenance?

Running many hours per year is exactly where the 60,000-hour overhaul interval matters. Maintenance planning and remote monitoring become more valuable than at low-hours standby duty. We can include monitoring and a spare parts recommendation in the scope.

What is the lead time?

Typical production lead time is 45–75 days depending on configuration, voltage and gas treatment scope, plus shipping. Contact us for a current commitment date.